Skip to content
Ideal AutomationIdeal Automation

Wired right, from the start.

Pre-wire and structured low-voltage cabling done during construction — so your home is ready for lighting, audio-video, networking, shades, security, and automation, with room to grow for years to come.

The best time to wire a home is before the drywall goes up. We work from your plans — or design the system with you — to run organized, labeled, future-ready low-voltage cabling to every place a screen, speaker, keypad, camera, shade, or access point might go, even spots you have not decided on yet. Doing it right during construction means no fishing wires through finished walls later, one clean central equipment location, and a home that is ready for whatever technology comes next.

Why homeowners choose us

What makes our structured wiring & pre-wire better

Do it once, do it right

Running wire during construction costs a fraction of retrofitting a finished home — and avoids the mess. We plan for today and leave headroom for tomorrow.

Wired for everything

Lighting, audio-video, networking, shades, security, and automation all ride on one clean low-voltage backbone — labeled, tested, and terminated to a professional standard.

A clean central hub

Every cable lands in one organized equipment location — neat, accessible, and easy to service or expand for years to come.

Future-ready capacity

We pull extra runs and conduit where it counts, so adding a camera, TV, or access point later is plug-and-play instead of a remodel.

Our process

How we work

A clear, step-by-step process — so you always know what comes next.

  1. 1

    Plan review & wiring design

    We review your floor plans and how you live to map out every drop — TVs, speakers, keypads, cameras, shades, and access points.

  2. 2

    Rough-in pre-wire

    Before drywall, our technicians run and label organized low-voltage cabling to every location, with extra capacity built in for the future.

  3. 3

    Central equipment location

    All cabling terminates in one clean, accessible hub — racks, patch panels, and power planned for easy service and expansion.

  4. 4

    Trim, terminate & test

    After construction, we terminate, test, and certify every run so the home is ready for devices and systems.

  5. 5

    Handoff & documentation

    We document the wiring map so future upgrades are simple — no guesswork, no opening walls.

Frequently asked questions

When should structured wiring be done?

During construction or a major remodel — after framing and before drywall. That is when running cable is easiest and least expensive.

What does structured wiring include?

Low-voltage cabling for networking, audio-video, lighting control, motorized shades, security cameras, door stations, and Wi-Fi access points — all run to a central equipment location.

Can you pre-wire if I have not chosen my systems yet?

Yes. We wire for flexibility — running cable and conduit to likely locations so you can add or change systems later without opening walls.

Do you work with my builder?

Absolutely. We coordinate with your builder and trades to schedule the rough-in pre-wire at the right phase of construction.

Let’s design your space.

Tell us about your home or project. We’ll walk your vision and engineer a system built to a reference-grade standard.